In the case when the surface is necessary to impose a primer material is applied evenly odinite layer using a roller. After this mixture is prepared. If you use dry filler, it is mixed with the required amount of clean water and stirred with a mixer or by hand. Some mixtures give some time to settle for what would be dissolved additives, and then again mixed. Then clean foundation for the putty moisturize, and materials with high water absorbency (lime-sand bricks or porous concrete) moisturize several times. The outer layer of putty is placed on its Uncured lower layers, which are used for alignment. Fillers are applied to the surface ready for finishing at temperatures of +10 to + 25 C, avoiding direct sunlight or heated surfaces. Humidity Environment must not be below 60%.
Work. Fillers can be applied by trowel or gun - spray, smoothing with a rubber spatula. The layer thickness is 1-1.5 mm. Works on conventional putty spatula begin with fill large cavities and irregularities. Once the solution dries and hardens, smooth movements cause the leveling layer. Experts recommend using a wide spatula, stainless steel together with a small spatula, allowing the entire filler without a trace. Alignment angles are using a special corner trowel. It is important to check the geometry of the walls and corners with building level. The final polishing is carried out with shlifovaloy grater with a handle. The next day, remove the defective installation, overwriting with sandpaper or increasing the amount of material in the plane of the workpiece. Shell and perform finishing with a rubber spatula, causing strokes perpendicular to one another.
Posted by: |